We install the mechanical, electrical and HVAC infrastructure that a test chamber needs to be ready for measurement, together with the chamber itself. The positions of the turntable, antenna mast and measurement equipment, the cable routes and the control room connections are planned in advance. Filtered power, lighting, ventilation and fire detection are integrated without compromising the shielding. After installation the systems are tested together and the chamber is handed over with user training.
Scope
- Turntable and antenna mast integration
- Control room and measurement rack layout
- Filtered power and lighting
- Shielded ventilation and air conditioning
- System testing and user training